Apr 01, 2025
Moving a User to a New Schedule
Prerequisites
- Access to the Admin Panel and Manual Schedule Edits on the Grid
Step 1: Navigate to the Admin Panel and Assign the User to the New Group
- Go to the Admin Panel -> Groups & Schedules -> Assign Groups
- Locate the user and move them to the desired new Group
Step 2: Go to the Schedule Grid and Remove the User's Existing Shifts
- On the Grid, find the user's current Group
- Right-click on the first shift you want to remove and select "Remove Shifts From This Day Onward"
- In the pop-up window, leave the any boxes unchecked (i.e. "Time Off") to keep those entries on the Grid
Step 3: Add the New Shift Series for the User in the New Group
- On the Grid, locate the user's new Group
- Select "+ Shift Series"
- Configure the new Shift Series as desired
Note: Be cautious when making changes to the schedule to avoid disrupting other users' schedules.